Risk assessments that keep up with the ramp.

For whoever owns the risk. Grade each hazard before and after its controls, and link those controls to what happens on the ground.

  • Anyone can report from their phone

  • See which controls are really working

  • Fixes are checked before they're closed

  • Your information stays private to you

The problem in your words

Does any of this sound familiar?

  • Signed and filed

    It was signed off last year and hasn't been opened since.

    The job changed. The crew changed. The assessment did not, and nobody can say when it was last read.

  • Every site starts again

    Each site writes its own, and no two match.

    When the standard changes, nobody knows which sites have kept up, or who to ask.

  • Nobody asked the crew

    The people doing the job never saw it.

    It was written at a desk. On site, the controls it relies on may not even be there, and nobody would know.

A live assessment, not a filed one.

  • Signed and filed

    Before and after controls

    Grade each hazard before its controls and after them, against a target, on your own risk matrix. You see the grade as you set it.

  • Every site starts again

    One standard, every site

    Write the standard for an activity once. Each site works from it rather than from a copy. When the standard moves on, a site that has fallen behind is shown as needing a review, so an improvement can reach every place that uses it.

  • Nobody asked the crew

    Who was there, and who signed

    Record who was consulted. Attach photos, surveys or method statements. Whoever submits an assessment cannot approve it. Set a review date, and people can ask for a review sooner.

  • Nobody asked the crew

    The same controls everywhere

    The controls an assessment relies on are the ones your inspections check and your reports name. Barrier Health shows how each one is doing.

    Barrier Health lists each control with its verdict. Pedestrian segregation is in place on every check but did not hold in two events.

    Checks say a control is in place. Events say whether it held.
  • Signed and filed

    See it as a bowtie

    Lay a risk out as a bowtie: what could start it, the controls on each side, and what could follow. It is there when a picture helps, and you can open it on a canvas and work through it with the team.

  • Make it yours

    Set your own risk matrix, scales and bands. Rename anything you like, and an update never overwrites what you have changed.

Works with what you do already

An assessment that stays in touch.

Each assessment has a connected view of the records joined to it. It shows the link. It does not say what the link means.

Potentially relevant

  • Controls

    The ones the assessment relies on, with what their checks have recorded.

  • Reports

    That name the same activity or control.

  • Inspections

    That check the same controls.

  • Site versions

    Worked from the same standard, and whether they have kept up.

Petowo shows what these records have in common. Your people decide what it means.

Standards it helps you evidence

Petowo keeps the records. It does not certify you, and your auditor makes the judgement.

ISO 45001, clause 6.1.2
Helps you evidence how hazards were identified and how the risk was assessed.
ISO 45001, clause 5.4
Helps you evidence who was consulted on an assessment.
ISO 45001, clause 8.1.2
Helps you evidence the kind of control you relied on, from removing the hazard down to PPE.

What people ask us

Can we use our own risk matrix?

Yes. Set your own matrix, scales and bands on a screen, with no code. Each grade is worked out on your matrix, not ours. An update from us never overwrites what you have changed.

Do we have to start from nothing?

No. Petowo can start you with a library of activities, hazards and controls, and you add your own. Your current document, as a PDF, can sit on the assessment as evidence while you move across at your own pace. If a hazard is missing, someone can propose it for the library, and it waits for approval.

Can a site change the standard assessment?

A site works from its own version of the standard, for its own place. The two stay joined, so you can see when the site falls behind, and the standard's own page lists every place using it.

Who approves an assessment?

Someone other than the person who submitted it. Once it is live, it cannot be rewritten in place. You put it under review, change it, and it is approved again, so the version people relied on stays on the record.

How do we know a review is due?

Each assessment has a review date. It shows as due soon, then overdue, so nobody needs to keep a diary of them. Someone can also ask for a review sooner, and that request stays on the record.

Do we have to use bowties?

No. A bowtie is there when it helps you see a risk, or to talk it through with a team. The grades, controls and review dates all work without one.

The same knitted-wool construction site. The three workers stand by a risk grid of green, yellow and red squares, one moving a square to green, and the trench behind them is fenced with a yellow barrier.

Every risk rated. The trench is fenced.

Bring one of your own risk assessments, and we will walk it through Petowo with you.