PetowoPetowo
A knitted-wool illustration of an electric train at a depot at dusk. A maintainer in orange kneels on the roof beside the pantograph, under the overhead wire, while two colleagues stand by a trackside isolation switch with no padlock or tag, one raising a hand, worried.

Industries / Rail

Isolated, locked off and looked out for, on every shift.

For track, overhead line and depot teams, and the contractors who work across your routes. Record every isolation point, tie it to the permit and report from the lineside.

  • Anyone can report from their phone

  • See which controls are really working

  • Fixes are checked before they're closed

  • Your information stays private to you

The problems you know

Does any of this sound familiar?

  • Isolations

    Is it locked off, or just switched off?

    The switch is by the track, the permit is in the office and the person on the roof is relying on both. Without a padlock or a tag, nobody can tell by looking.

  • Lookouts

    Heads down, and nobody looking up the line.

    The gang is mid-job and a train is on the way. A lookout or a barrier that isn't there is hard to see on a form.

  • Working side by side

    Two gangs in one possession, on two plans.

    Track, overhead line and signalling all want the same access. Each plan looks fine until somebody lays them on top of each other.

Who is isolated, who is protected and who else is there.

  • Isolations

    Every isolation point, on the permit

    List each point with its lock and tag number. The holder applies it, and another authorised person verifies it. A point cannot be restored while a permit that depends on it is still open.

  • Lookouts

    See which controls hold at each site

    Petowo does not plan possessions or lookouts. It records the event, and links it to the control it is about, such as the lookout or the barrier. Barrier Health shows which hold, site by site.

    Barrier Health lists each control with its verdict. Pedestrian segregation is in place on every check but did not hold in two events.

    Checks say a control is in place. Events say whether it held.
  • Working side by side

    Overlapping work, seen together

    Log overlapping work at one place with a coordinator, the potential conflict and the controls, so the people on each job can see the other.

  • Lookouts

    The fix, checked by someone else

    Raise each fix with one owner and one due date. When the work is done, someone who neither owns it nor did it checks it, whether it is your team or a contractor's.

    The actions list, then one action that is closed only after an independent verification step done by someone other than its owner.

    Closed means checked, by someone who did not do the work.
  • Your words, your sites

    Rail starts from the general set-up. We then set it up in your words: your routes, depots and sites, your contractors, your event types and your lists. Add your own questions to a report, such as the line or the mileage. An update never overwrites what you have changed.

What people ask us

Does Petowo plan possessions or set up lookouts?

No. Petowo has no possession planning or lookout feature. It records the event, links it to the control it is about and checks the fix. Your planners keep their own tools.

Does it manage overhead line earthing?

No. Petowo has no earthing feature of its own. An isolation is recorded point by point, with its lock and tag, and tied to the permit. UK overhead line runs at 25,000 volts, and your own procedures for it stay in charge.

Do your forms fit our rule book?

Petowo comes with starter permit conditions, and you review and change them. It does not claim to meet any rule book. Your competent people decide what the conditions should say.

Can contractors work in it?

Yes. Invite them as guests, and guests are free with no limit. An administrator reviews each contractor's evidence and sets when it runs out. A permit for contractor work has to name a vetted contractor.

The same knitted-wool train in the evening. The trackside switch is locked off with padlocks and a red and white tag, a yellow earth strap runs from the overhead wire down to the rail, and the maintainer on the roof and the two colleagues give a thumbs up.

Locked off, tagged and earthed. Thumbs up.

Bring an isolation or a near miss from your own railway, and we will walk it through Petowo with you.