Opening the line
Gas tests that stay on the permit
Line break, confined space and hot work permits carry limits for the gases you test and how often to test again. Each reading stays on the permit, and shows whether it sits inside them.

Industries / Chemicals & process
For chemical plants, process sites and the teams who maintain them. Tie every isolation to its permit, keep one register of what you hold and report from the plant.
Anyone can report from their phone
See which controls are really working
Fixes are checked before they're closed
Your information stays private to you
The problems you know
Opening the line
A valve with no lock, a flange half undone and a smell in the air. The job was planned, but not in the way that counts.
In the store
Drums move and data sheets go out of date. You find out that the register is wrong on the day someone needs it.
Turnarounds
A shutdown brings contractors, overlapping jobs and long days. Everyone is under pressure, and the paperwork falls behind.
Opening the line
Line break, confined space and hot work permits carry limits for the gases you test and how often to test again. Each reading stays on the permit, and shows whether it sits inside them.
In the store
Each report lands on the control it is about, such as the bund. Barrier Health sets what your checks found beside what events said, unit by unit.
Barrier Health lists each control with its verdict. Pedestrian segregation is in place on every check but did not hold in two events.
Turnarounds
An administrator reviews each contractor's evidence, records what was checked and sets when it expires. A permit for contractor work has to name a vetted contractor.
Opening the line
Raise each fix with one owner and one due date, through the turnaround and after it. When the work is done, someone who neither owns it nor did it checks it.
The actions list, then one action that is closed only after an independent verification step done by someone other than its owner.
List each point with its lock and tag number. The holder applies it, and it is verified before work starts.
A permit names the isolations it depends on. A point cannot be restored while a linked permit is still open.
Chemicals and process start from the general set-up. We then set it up in your words: your sites, plants, units and areas, your contractors, your permit conditions, your event types and your lists. Keep your own risk matrix. An update never overwrites what you have changed.
Each substance, with where it is held, how much, its hazard class and when its safety data sheet was last revised. A report of a leak can land on the control it is about, such as the bund.
Yes. Log overlapping work at a place with a coordinator, the potential conflict and the controls, so nobody has to lay the plans on top of each other by hand.
No software can. Petowo keeps the permits, isolations, readings and records. Whether your work meets the rules is for you and your competent people to judge.
Yes. Lay a risk out as a bowtie, with what could start it, the controls on each side and what could follow. It is there when a picture helps.
No. Petowo records what people report, check and fix. It does not read your plant.

Bring an isolation or a near miss from your own plant, and we will walk it through Petowo with you.