PetowoPetowo
A knitted-wool illustration of a water treatment works. A worker in an orange vest climbs down a ladder into an open chamber with no harness, and a colleague stands over him with a hand to his mouth, worried.

Solutions / Permits & Control of Work

Authorise high-risk work with controls, gas tests and isolations tied together.

For engineering, maintenance, utilities and high-hazard site teams. Run permits to work, gas test readings, lock-and-tag isolations, SIMOPS reviews and lone working in one record.

  • Anyone can report from their phone

  • See which controls are really working

  • Fixes are checked before they're closed

  • Your information stays private to you

The problem in your words

Does any of this sound familiar?

  • Permits on paper

    The permit stayed in the cab while the work changed.

    Conditions, gas tests and sign-offs live on separate bits of paper. Nobody can see from one screen what is open right now.

  • Separate isolations

    A valve was opened while another crew still held a permit.

    Lock-and-tag points sit in a binder away from the permit. Restoring energy happens before everyone's work is actually closed.

  • Jobs overlapping

    Hot work underneath, painters overhead, and nobody joined them up.

    Two permits run in the same bay without a review of how one affects the other, or a contractor walks on site with an expired ticket.

One control room for high-risk work.

  • Permits on paper

    Seven built-in permit types with real gates

    Start with hot work, confined space, work at height, electrical, excavation, lifting and line break, each with conditions you configure and authorised signers required before issue.

  • Permits on paper

    Gas testing on a schedule

    Record atmospheric gas readings against configurable permit-type thresholds, with retest intervals tracked directly alongside the live permit.

  • Separate isolations

    Lock-and-tag isolations linked to permits

    Record mechanical, electrical and process isolation points with lock and tag numbers, require independent verification, and block restoration while linked permits stay open.

  • Jobs overlapping

    Overlapping work, vetted contractors and lone working

    Flag overlapping permits sharing the same place and window, log SIMOPS coordination reviews, require vetted contractors on contractor permits, and escalate missed lone-worker check-ins across two alarm steps.

  • Make it yours

    Configure permit types, atmospheric gas limits, authorisation roles and contractor requirements once on a screen, then publish without overwriting local site changes.

Works with what you do already

Permits sit beside the people, places and records around them.

A permit in Petowo connects straight to the operational records at that place, without duplicating data.

Potentially relevant

  • Lock-and-tag isolations

    Isolation certificates and individual points holding the job open.

  • Contractors

    Vetted organisations and expiring compliance evidence checked before issue.

  • Events and actions

    Events raised near active work, and actions assigned with owners and due dates.

  • Risk assessments and procedures

    Controls and controlled procedures that share the same activity or place.

Petowo shows what these records have in common. Your people decide what it means.

Standards it helps you evidence

Petowo keeps the records. It does not certify you, and your auditor makes the judgement.

ISO 45001, clause 8.1
Helps you evidence operational planning and control for hazardous maintenance, contractors and simultaneous operations.

What people ask us

Can we adjust permit types, gas limits and conditions?

Yes. Seven built-in permit types come ready as a starting point, and administrators configure conditions, required documents, gas limits and authorised signers per permit type.

What happens when two permits overlap at the same place?

The permit board highlights overlapping permits sharing the same site node and time window, and you can log a formal SIMOPS coordination review with extra controls before work proceeds.

Can an isolation be removed while work is still open?

No. While a linked permit remains open, restoring the linked isolation is blocked until the work is handed back and closed.

How does contractor vetting work on a permit?

Administrators review contractor organisations and record evidence with expiry dates. Where work involves a contractor, a permit requires a currently vetted contractor organisation.

How does lone working escalation work?

A lone worker starts a session with a check-in interval. If a check-in is missed, the first named contact is alerted; if still unanswered after the configured delay, a second escalation alarm triggers.

The same knitted-wool works. A silver tripod and winch stand over the open chamber, one worker in a harness holds up a yellow gas detector, and a colleague at the winch smiles.

Signed, tested, locked off and seen together.

Bring one permit workflow or isolation register from your site, and we will walk it through Petowo with you.