Permits on paper
Seven built-in permit types with real gates
Start with hot work, confined space, work at height, electrical, excavation, lifting and line break, each with conditions you configure and authorised signers required before issue.

Solutions / Permits & Control of Work
For engineering, maintenance, utilities and high-hazard site teams. Run permits to work, gas test readings, lock-and-tag isolations, SIMOPS reviews and lone working in one record.
Anyone can report from their phone
See which controls are really working
Fixes are checked before they're closed
Your information stays private to you
The problem in your words
Permits on paper
Conditions, gas tests and sign-offs live on separate bits of paper. Nobody can see from one screen what is open right now.
Separate isolations
Lock-and-tag points sit in a binder away from the permit. Restoring energy happens before everyone's work is actually closed.
Jobs overlapping
Two permits run in the same bay without a review of how one affects the other, or a contractor walks on site with an expired ticket.
Permits on paper
Start with hot work, confined space, work at height, electrical, excavation, lifting and line break, each with conditions you configure and authorised signers required before issue.
Permits on paper
Record atmospheric gas readings against configurable permit-type thresholds, with retest intervals tracked directly alongside the live permit.
Separate isolations
Record mechanical, electrical and process isolation points with lock and tag numbers, require independent verification, and block restoration while linked permits stay open.
Jobs overlapping
Flag overlapping permits sharing the same place and window, log SIMOPS coordination reviews, require vetted contractors on contractor permits, and escalate missed lone-worker check-ins across two alarm steps.
Configure permit types, atmospheric gas limits, authorisation roles and contractor requirements once on a screen, then publish without overwriting local site changes.
Works with what you do already
A permit in Petowo connects straight to the operational records at that place, without duplicating data.
Potentially relevant
Lock-and-tag isolations
Isolation certificates and individual points holding the job open.
Contractors
Vetted organisations and expiring compliance evidence checked before issue.
Events and actions
Events raised near active work, and actions assigned with owners and due dates.
Risk assessments and procedures
Controls and controlled procedures that share the same activity or place.
Petowo shows what these records have in common. Your people decide what it means.
Petowo keeps the records. It does not certify you, and your auditor makes the judgement.
Yes. Seven built-in permit types come ready as a starting point, and administrators configure conditions, required documents, gas limits and authorised signers per permit type.
The permit board highlights overlapping permits sharing the same site node and time window, and you can log a formal SIMOPS coordination review with extra controls before work proceeds.
No. While a linked permit remains open, restoring the linked isolation is blocked until the work is handed back and closed.
Administrators review contractor organisations and record evidence with expiry dates. Where work involves a contractor, a permit requires a currently vetted contractor organisation.
A lone worker starts a session with a check-in interval. If a check-in is missed, the first named contact is alerted; if still unanswered after the configured delay, a second escalation alarm triggers.

Bring one permit workflow or isolation register from your site, and we will walk it through Petowo with you.